Resolution.Run started a goroutine for every remote, even without
Parallel. The dashboard handlers run sequentially and rely on net/http
recovering a panic, which it only does on the request's goroutine, so a
panic while resolving a remote would have ended the server process
instead of failing one request, as it did before the resolution moved
into internal/check.
The sequential and the parallel path are now separate loops, so the
invariant is visible instead of being spread over three Parallel checks.
Refs #444